The floor has been sanded and the first coat of polyurethane has been applied


Floor after being sanded and a coat of poly



The chapel


The floor has been laid and nailed and waiting to be sanded




The floor has been laid and nailed in place





The floor as seen though the open door



Nailing down the floor


Putting the floor down


Looks great


Chris and Paul start to lay out all the boards like a big jigsaw puzzel to make sure they fit and we have enough for the floor.


Laying out the boards



Chris carries some board inside the chapel. the accessible ramp railings are finished












Chris trims each floor board. The boards are all hickory that we cut on the property and then had milled and tongue and grooved.