Friday, March 6, 2009

March 2009


The sconces inside the chapel have been turned on!


The sconce in the vestibule



The ceiling fan and track lights on the beams have been installed



The sconces have been put up on the walls


They have finished the stain on the outside of the chapel


Staining the chapel





The front of the chapel stained





Looks nice!





What a great space for reflection and prayer





Nice look in the sunlight





Starting the staining process to process













The paint crew takes advantage of a beautiful but cool day













Lot of work involved in staining the chapel







Spreading the mulch around all the plantings






The mulch looks great! Thanks Jimmy!






The Bihsop Taylor Hermitage






The Evleyn Underhill Hermitage






Chaepl staining






Getting the stain in those hard to reach spaces under the eaves





He is almost laying down to get under the eaves






Spreading mulch






Staining the trim around the windows







The two accessible ramps


The gravel has been graded between the accessible hermitage and the chapel


























The interior walls are finished


























Bathroom tile is grouted


























Looks great.


























The second coat is done with some sanding in between the coats. WOW!

















































































The whole crew is taking advantage of the nice day with temps in the 70's



























Painting the trim

















































The paint crew starts on the outside trim

























Gravel is brought in the bring the grade up to the ramps



























Marley guards the chapel door



























The clear coat really brings out the grain in the wood




















































The painting crew is putting a clear coat on the cherry to preserve and protect it

















































At the same time they are putting a clear coat on the beams and the ceiling boards

























Clear coat on the cherry board

























Snow on the chapel roof. We had about 12 inches of snow on March 1-2 and then by Friday March 6 it was 60 degrees and almost melted.


























The ice guards on the roof really do work!


























Paul and Cris build the chapel deck and railings


























The chapel railings are put in place


























Working on the deck and the accessible ramp


























Working on the ramp


























Paul works on the deck and ramp


























Paul works on the porch pickets

























Working on the chapel porch














































































Sanding all the beams and ceiling and walls is a big job