The floor has been sanded and the first coat of polyurethane has been applied

Floor after being sanded and a coat of poly

The chapel

The floor has been laid and nailed and waiting to be sanded

The floor has been laid and nailed in place

The floor as seen though the open door

Nailing down the floor

Putting the floor down

Looks great

Chris and Paul start to lay out all the boards like a big jigsaw puzzel to make sure they fit and we have enough for the floor.

Laying out the boards

Chris carries some board inside the chapel. the accessible ramp railings are finished

Chris trims each floor board. The boards are all hickory that we cut on the property and then had milled and tongue and grooved.

Chris and Paul trimming all the floor boards