The floor has been sanded and the first coat of polyurethane has been applied
Floor after being sanded and a coat of poly
The chapel
The floor has been laid and nailed and waiting to be sanded
The floor has been laid and nailed in place
The floor as seen though the open door
Nailing down the floor
Putting the floor down
Looks great
Chris and Paul start to lay out all the boards like a big jigsaw puzzel to make sure they fit and we have enough for the floor.
Laying out the boards
Chris carries some board inside the chapel. the accessible ramp railings are finished
Chris trims each floor board. The boards are all hickory that we cut on the property and then had milled and tongue and grooved.
Chris and Paul trimming all the floor boards
No comments:
Post a Comment