The sconces inside the chapel have been turned on!
The sconce in the vestibule
The ceiling fan and track lights on the beams have been installed
The sconces have been put up on the walls
They have finished the stain on the outside of the chapel
Staining the chapel
The front of the chapel stained
Looks nice!
What a great space for reflection and prayer
Nice look in the sunlight
Starting the staining process to process
The paint crew takes advantage of a beautiful but cool day
Lot of work involved in staining the chapel
Spreading the mulch around all the plantings
The mulch looks great! Thanks Jimmy!
The Evleyn Underhill Hermitage
Chaepl staining
Getting the stain in those hard to reach spaces under the eaves
He is almost laying down to get under the eaves
Spreading mulch
Staining the trim around the windows
The two accessible ramps
The gravel has been graded between the accessible hermitage and the chapel
The interior walls are finished
Bathroom tile is grouted
Looks great.
The second coat is done with some sanding in between the coats. WOW!
The whole crew is taking advantage of the nice day with temps in the 70's
Painting the trim
The paint crew starts on the outside trim
Gravel is brought in the bring the grade up to the ramps
Marley guards the chapel door
The clear coat really brings out the grain in the wood
No comments:
Post a Comment